Macquarie Equipment Trading on behalf of Micron Memory Taiwan Co., Ltd. (F16)

Tokyo Electron Ltd. Telius 305 SCCM

Asset ID: 10209

Print spec sheet

Tokyo Electron Ltd.

Telius 305 SCCM

Dielectric Etch

Etch/Ash/Clean - Plasma Processing

Equipment details:

Date of Manufacture: Jun 11, 2003

Currently Configured for: 300mm

Current Equipment Status: Available

Asset HDD not included

Location of Equipment: Taichung City, Taiwan

Available date: 4/30/2021


Tool config is based on original PO, please verify tool details at tool inspection


Tool is configed with 2 chambers


Standard Specifications

Software Revision: Linux 6.75 Rev 000-VSTD6.75a

Lot Stability Dummy SW: Software for running lot stability wafer.

OEE WPH Software: SW only for OEE throughput upgrade.

GEM SEC Revision: TBD

Wafer Size: Diameter 300+/- 0.20mm(SEMI M1.15), Notch

Carrier: FOUP (Comply with SEMI E47.1 (25wafers))

Inter Face: 3 carrier stage (Continuous flow operation) with Semi compliant MENV and FIMS assemblies

Online Connection: GEM / CIM GJG (Hardware Interface : Ethernet 100Base-Tx)

"Interface A: GEM/CIM GJG

Hardware interface : Ethernet 100Base-Tx"

Utility Box: Regulator : Air/AR2500(SMC), N2/SQ-420E(VERIFLO), He/SQMICRO(VERIFLO)

Utility Box: Manual Valve : OGD20V-6RM-K / OGD10V-4RM-K (CKD)

Utility Box: Pressure Gauge : Bourdon Gauge

Loader Mod Corrosion Prevent: SUS Parts, Ball screw & Liner guide : PTFE Coating

Load Lock Pressure Monitor: Pressure Switch : VSA100A (INFICON)

Load Lock Pressure Monitor: Pirani gauge : TTR211S LEYBOLD)

Load Lock Pressure Monitor: CM : 626A01TDE (MKS)

Maintenance Monitor: 2 (Flat Panel Display Touch Screen Type)

Water Leak Detector: 4 (LM;1, each PS;1)

Signal Tower: Red/Yellow/Green/ (Upper Left of Front x1 & Upper right section of loader on maintenance side x1)

Data Back up: MO drive

EMO: Front x1, Rear x3

Cable Length: 12m (Interconnection), 16m (Top RF cables),15m(Btm RF cables)

Inter Locks: External (When the I/L signal is received from Factory, gas valves are closed)

Fittings: Standard


Supporting Remote Units

"Chiller: Daikin UBRPD5B-2T2

* stopped production"

Coolant: Lower:FC3283, Upper:FC40

Chiller Hose: BRINE HOSE 12/11M

Handy Maintenance Controller: LCD DISPLAY UT3-TLN21-A

RF Generator TOP: AGA-50B2

RF Matcher TOP: AMN-50B2

RF Generator Bottom: WGA-50E

Matching Controller: WMN-50H6(2MHZ/5KW)(PS3)

Pen Record Box: 2L80-00212-12

Loader Module: SELME2112ZS22-AD5

LOAD PORT: SELOP12F25-30U-14

DRIVE UNIT: SBX92102928

READER OPTICAL: ISS-1700-1TELCC

Carrier ID Reader: KEYENCE BL-601 HAC1-SO

APC: 10 INCH (250MM)


Hardware Configuration

Proc Chbr 1,2: SCCM Oxide; Y203 Coating

Chamber hardware: FCC

Endpoint type: SE2000ii

ESC type: ELECTRODE BTM,H2 T4 12YG L

Focus ring: 3.4mm

Thunderwall He Gas Inlet: Ceramic Thunderwall with Ceramic pusher pins.

Polished focus ring: None

FC lower insulator: INSULATOR,LOWER (RE)

Magnet Shield: None

Oring for Chbr Body-Depos: Armorcrystal

CEL Body ASSY: Upper electrode constant temperature control

"TMP: FT-3301

(MITSUBISHI)"

TMP Back Pressure Monitor: 51A11TGA2BA003 (MKS)

Dry Pump: MU300(KASHIYAMA) Customer Supply

Final Valve, Heater: Valve; AGD21V-6RM-GWL4 (CKD)

Filter: Filter; CEP-TM_HL-VR-03PB (Toshiba Ceramic)

APC: 10 INCH (250MM)

Pressure Monitor: C/M (Process Monitor) : 627BRETDD2P (MKS), 45deg, 30Pa

Pressure Monitor: C/M (Self Check) : 627B11TDC2P (MKS), 45deg, 1330Pa

Pressure Monitor: B.A. Gauge (CM Calibration) : BPG400 (INFICON), 2.0x10-5 ~ 0.1Pa

Pressure Monitor: ATM Switch : 41B13DGA2AA040 (MKS)

Pressure Monitor: Pressure Switch : 51A11TGA2BA010 (MKS), H2/fluoro gas


Gas Box Configuration

Gas Line 1: Gasline-1 Ar FCSDN-4WS-798-F1600

Gas Line 2: Gasline-2 C4F6 FCSDN-WR-4WS-798-F122B

Gas Line 3: Gasline-3 C4F8 FCSDN-WR-4WS-798-F122B

Gas Line 4: Gasline-4 C5F8 FCSDN-WR-4WS-798-F115A

Gas Line 5: Gasline-4 C5F8 FCSDN-WR-4WS-798-F200A

Gas Line 6: Gasline-6 Xe FCSDN-WR-4WS-798-F1L

Gas Line 7: Gasline-7 O2 FCSDN-4WS-798-F65

Gas Line 8: Gasline-8 O2 FCSDN-4WS-798-F600

Gas Line 9: Gasline-9 CF4 FCSDN-4WS-798-F260

Gas Line 10: Gasline-10 CHF3 FCSDN-4WS-798-F260

Gas Line 11: Gasline-11 CH2F2 FCSDN-4WS-798-F80

Gas Line 12: CAP

Purge: N2 (Process Grade N2)

Filter: CNF1004USG4 (Nihon Pall)

"Regulator: SQMICRO (VERIFLO)

12-1A01IGS2W1.54"

Filter (N2): SQMICRO (VERIFLO)

Valve: Primary side(Utility-MFC):Mega mini (FUJIKIN)

Valve: Secondary side(MFC-PC):Mega one (FUJIKIN)

Piping: Dual Piping (for Gas leak containment, Gas box to Final valve & Exhaust through Gas box)

Gas Leak Detection Port: 5 Ports (6.35mm, Swagelok L-type)

Final Pressure Switch: 51A (MKS)

Pressure Gauge: Bourdon Gauge (with inside finishing)

Pressure Gauge: Bourdon Gauge (with inside finishing) 0.4MPa

SP3 Gas Line Connection: Single Line Drop

GBROR: GBROR


Process Kit Configuration

WINDOW, SHIELD DEPO(DRM2) QRTZ: WINDOW, SHIELD DEPO (DRM2) QUARTZ

WINDOW DEPO SAF0.5(DRM2) SAPPh: WINDOW DEPO SAF0.5(DRM2) SAPPHIRE

SHIELD, UP 300MM RING-Qrtz: RING,SHIELD UPPER,STRAIGHT

Insulator, ESC Enclosure (COC): Insulator, ESC Enclosure (COC) - Quartz

Cover Ring, 360- L (M) - Qrtz: Cover Ring, 360- L (M) - Quartz

RING, BTM SHIELD Y-AL, SE: RING, BTM SHIELD Y-AL, SE

PLATE,EXHAUST Y-AL, SE: PLATE,EXHAUST Y-AL, SE

SHUTTER,BTM TYPE Y-AL, SE: SHUTTER,DEPO Y-AL,LAB MIN

SHIELD,DEPO: SHIELD,DEPO LAB Y-AL SE 2

Focus Rg, 360-302-COC: Focus Rg, 360-302-COC

Insultr, lwr T32-R6-BL-NC: INSULATOR,LOWER T32-R6-BL-NC

WINDOW,DEPO CLP: WINDOW,DEPO CLP

SCREW PIN LOCK, Cerazol: SCREW,PIN,LOCK

Si Upper Electrode: Si Upper Electrode

CEL ASSY: CEL,OX T10-75-C912 (COC-N)

ESC ASSY: ESC ASSY、SCCM-OX L


Damage/Missing parts list

None reported, please inspect to reconfirm

Dry pumps and customer provided items not included on sales

Enquire about this product

I agree to receive further communication from Macquarie Group Limited in accordance with its Privacy Policy, as amended from time to time.

Product Images

The information referenced on this page is accurate to the best of our knowledge. We do not warrant the completeness or accuracy of the information contained herein. Interested parties are encouraged to request inspection to verify equipment condition, configuration, and completeness. Any offer to purchase equipment shall be subject to our standard terms and conditions of sale.


Related products

No results message:
Displayed when filters returns no results.

We couldn't find any items that match your criteria.

Please try a different keyword.

Service unavailable:
Displayed when filter service cannot be reached.

Sorry, this service is currently unavailable.

Please try again later.

Get in touch

Have a question for our team?

Ask about our equipment solutions, ranging from Macquarie equipment inventory sales, sourcing programs, surplus disposition options, and direct equipment purchases.

I agree to receive further communication from Macquarie Group Limited in accordance with its Privacy Policy, as amended from time to time.