The images and data contained herein is owned by Macquarie and is intended for use only by potential purchasers of goods shown herein. Except for such permitted usage, no other use of the images and data is permitted and such images and data shall not be exhibited or shown in any websites or social media or for any commercial purposes without Macquarie’s written permission. Therefore, no seller of goods like the goods shown herein has any right or authority to show or exhibit any images or data shown herein.


Asset ID: 185498

Enquire about this product Print spec sheet

Tokyo Electron Ltd. (TEL)

Telius SP-305 SCCM

Dielectric Etch

Etch/Ash/Clean - Plasma Processing

Equipment details:

Date of Manufacture: 2007-01-01

Currently Configured for: 300mm

Current Equipment Status: Available

Asset HDD not included

Location of Equipment: Taichung City, Taiwan

Available date: Currently Available

Tool config is based on original PO, please verify tool details at tool inspection


Tool is configured with 3 chamber


Standard Specifications

Software Revision: Linux 6.75 Rev 000-VSTD6.75a

Lot Stability Dummy SW: Software for running lot stability wafer.

OEE WPH Software: SW only for OEE throughput upgrade.

Wafer Size: Diameter 300+/- 0.20mm(SEMI M1.15), Notch

Carrier: FOUP (Comply with SEMI E47.1 (25wafers))

Inter Face: 4 carrier stage (Continuous flow operation) with Semi compliant MENV and FIMS assemblies

Online Connection: GEM / CIM GJG (Hardware Interface : Ethernet 100Base-Tx)

Utility Box: Regulator : Air/AR2500(SMC), N2/SQ-420E(VERIFLO), He/SQMICRO(VERIFLO)

Utility Box: Manual Valve : OGD20V-6RM-K/OGD10V-4RM-K(CKD)

Utility Box: Pressure Gauge : Bourdon Gauge

Loader Mod Corrosion Prevent: SUS Parts, Ball screw & Liner guide : PTFE Coating

Load Lock Pressure Monitor: Pressure Switch : VSA100A (INFICON)

Load Lock Pressure Monitor: Pirani gauge : TTR211S LEYBOLD)

Load Lock Pressure Monitor: CM : 626A01TDE (MKS)

Maintenance Monitor: 2 (Flat Panel Display Touch Screen Type)

Water Leak Detector: 4 (LM;1, each PS;1)

Signal Tower: Red / White / Green / Blue

EMO: 7(Front:2, Rear:5)

Cable Length: 20m (Interconnection), 19 (Top RF cables),20m(Btm RF cables)

Inter Locks: External (When the I/L signal is received from Factory, gas valves are closed)

Fittings: No Brass Fittings


Supporting Remote Units

Chiller: Daikin UBRPD5A-2T2

* stopped production

Coolant: Lower:FC3283, Upper:FC40

Chiller Hose: BRINE HOSE Top/Btm : 18/19M

Handy Maintenance Controller: LCD DISPLAY UT3-TLN21-A

RF Generator TOP: AGA-50B2

RF Matcher TOP: AMN-50B2

RF Generator Bottom: WGA-50E

Matching Controller: WMN-50H2(2MHZ/5KW)

Pen Record Box: N/A

Loader Module: SELME2112ZS2-AR5(M)

BX80-071026-15

LOAD PORT: SELOP12F25-30B-14

BX80-070965-14

DRIVE UNIT: SBX92102926

BX80-070974-21

READER OPTICAL: None

Carrier ID Reader: N/A

APC: 10 INCH (250MM)


Hardware Configuration

Proc Chbr 1,2,3: SCCM Oxide; Y203 Coating

Chamber hardware: FCC

Endpoint type: SE2000ii

ESC type: Ceramics ESCwith STD Vpp

Focus ring: 3.4mm

Thunderwall He Gas Inlet: Ceramic Thunderwall with Ceramic pusher pins.

Polished focus ring: N/A

FC lower insulator: INSULATOR,LOWER (RE)

3D10-250542-11"

Magnet Shield: O

Oring for Chbr Body-Depos: Armorcrystal

Chemraz SC657"

CEL Body ASSY: Upper electrode constant temperature control

TMP: FT-3301

(MITSUBISHI)"

TMP Back Pressure Monitor: 51A11TGA2BA003 (MKS)

Dry Pump: ESR100WN:Ebara

Final Valve, Heater: Valve; AGD21V-6RM-GWL4 (CKD)

Filter: Filter; CEP-TM_HL-VR-03PB (Toshiba Ceramic)

APC: 10 INCH (250MM)

Pressure Monitor: C/M (Process Monitor) : 627BRETDD2P (MKS), 45deg, 30Pa

Pressure Monitor: C/M (Self Check) : 627B11TDC2P (MKS), 45deg, 1330Pa

Pressure Monitor: B.A. Gauge (CM Calibration) : BPG400 (INFICON), 2.0x10-5 ~ 0.1Pa

Pressure Monitor: ATM Switch : 41A13DGA2AA040 (MKS)

Pressure Monitor: Pressure Switch : 51A11TGA2BA010 (MKS), H2/fluoro gas


Gas Box Configuration

Gas Line 1: (01) NONE / F300

Gas Line 2: (02) CH2F2 / F80

Gas Line 3: (03) C4F8 / F122

Gas Line 4: (04) C4F6 / F180

Gas Line 5: (05) Ar / F2000

Gas Line 6: (06) O2 / F1300

Gas Line 7: (07) O2 / F65

Gas Line 8: (08) CO / F200

Gas Line 9: (09) CHF3 / F200

Gas Line 10: (10) CF4 / F300

Gas Line 11: (11) NONE / F50

Gas Line 12: (12) NONE / F500

Gas Line 13: (13) C4F6 / F39

Gas Line 14: (14) CHF3 / F50

Gas Line 15: (15) Ar / F110

Gas Line 16: (16) O2 / F10

Purge: One line serves up to 16 lines per box

Filter: CNF1004USG4(Nihon Pall)

GTMF3200F4A-VM4(Nihon Pall)

Regulator: N2-Purge: 12-1A21IGS2W(TESCOM)

Filter (N2): CNF1004USG4(Nihon Pall)

GTMF3200F4A-VM4(Nihon Pall)

Valve: Primary Side(Utility - FCS) : 

Mega mini(FUJIKIN)

Valve: Secondary Side(FCS - PC) : 

Mega One (FUJIKIN)

Piping: Dual piping at gas line from gas box to Final Valve & exhaust through gas box

Gas Leak Detection Port: 5 Ports (6.35mm, Swagelok type)

Final Pressure Switch: 51A (MKS)

Pressure Gauge: Bourdon Gauge(0.2Mpa)

(GAS1: Digital Gauge) 

Pressure Gauge: Bourdon Gauge(0.4Mpa)

SP3 Gas Line Connection: Single Line Drop

GBROR: None


Process Kit Configuration

WINDOW, SHIELD DEPO(DRM2) QRTZ: WINDOW, SHIELD DEPO (DRM2) QUARTZ (ES1D05-400022-14)

WINDOW DEPO SAF0.5(DRM2) SAPPh: WINDOW DEPO SAF0.5(DRM2) SAPPHIRE (ES1D10-406499-11)

SHIELD, UP 300MM RING-Qrtz: SHIELD, UPPER 300MM RING - Quartz (ES3D05-200094-12)

Insulator, ESC Enclosure (COC): Insulator, ESC Enclosure (COC) - Quartz (ES3D05-300142-13)

Cover Ring, 360- L (M) - Qrtz: Cover Ring, 360- L (M) - Quartz (ES3D05-300243-11)

RING, BTM SHIELD Y-AL, SE: RING, BTM SHIELD Y-AL, SE (ES3D10-100844-11)

PLATE,EXHAUST Y-AL, SE: PLATE,EXHAUST Y-AL, SE (ES3D10-100845-11)

SHUTTER,BTM TYPE Y-AL, SE: SHUTTER, BTM TYPE Y-AL, SE (ES3D10-101152-13)

SHIELD,DEPO: SHIELD,DEPO (ES3D10-100910-12)

Focus Rg, 360-302-COC: Focus Rg, 360-302-COC (ES3D10-250007-11)

Insultr, lwr T32-R6-BL-NC: Insulator, lower T32-BI-NC

WINDOW,DEPO CLP: WINDOW,DEPO CLP/Y2O3-100P(N) (ES3D10-350344-12)

SCREW PIN LOCK, Cerazol: Ceramic (ES3D10-404821-11)

Si Upper Electrode: Si Upper Electrode (ES3D10-302020-11)

CEL ASSY: CEL ASSY (ES3D87-003411-14)

ESC ASSY: ESC ASSY (with ceramic pusher pins) (ES3D87-052854-11)


Damage/Missing parts list

Please inspect tool to reconfirm

Dry pumps, HDD and customer provided items not included on sales

Product images

The information referenced on this page is accurate to the best of our knowledge. We do not warrant the completeness or accuracy of the information contained herein. Interested parties are encouraged to request inspection to verify equipment condition, configuration, and completeness. Any offer to purchase equipment shall be subject to our standard terms and conditions of sale.


Learn more -

Enquire about this product

I agree to receive further communication from Macquarie Group Limited in accordance with its Privacy Policy, as amended from time to time.

Related products

No results message:
Displayed when filters returns no results.

We couldn't find any items that match your criteria.

Please try a different keyword.

Service unavailable:
Displayed when filter service cannot be reached.

Sorry, this service is currently unavailable.

Please try again later.

Get in touch

Have a question for our team?

Ask about our equipment solutions, ranging from Macquarie equipment inventory sales, sourcing programs, surplus disposition options, and direct equipment purchases.

I agree to receive further communication from Macquarie Group Limited in accordance with its Privacy Policy, as amended from time to time.