Macquarie Equipment Trading on behalf of Micron Technology Taiwan, Inc. (F11)

Tokyo Electron Ltd. ALPHA-303i Nitride

Asset ID: 206029

Print spec sheet

Tokyo Electron Ltd.

ALPHA-303i Nitride

Vertical Furnace

Furnaces/Diffusion Systems

Equipment details:

Date of Manufacture: 2009

Currently Configured for: 300mm

Current Equipment Status: Available

Asset HDD not included

Location of Equipment: Taoyuan City, Taiwan

Available date: Currently Available

Process: NITR


Tool config is based on original PO, please verify tool details at tool inspection


System, General Specification

Safety Specification: SEMI S2-0706/CE

Shipping Area: ASIA

Host Communications: Comply with GJG

PIO I/F Connection: FNC Top

Automated Material Handling system: OHT

PGV Operation: None

Equipment Host I/F connection: Gas Box Top

Group Controller : AGC

External I/F: See External Input/Out table

FTP: None

WAVES Version: Ver 2.13 (WAVES)

Indicator: See customer Detail

Process Pressure : Low pressure

Process Temperature: 750

"Heater type: Mid-Temp. VMM-56-002 5Zone/500~1000c"

N2 Purge system: Installed

Boat Operation : 2 boats type

Carrier ID Reader Writer Type: RF(OP)

Maker/model: OMROM/V700-L21

Provider: TEL

Warning Label: English

Temperature controller: Furnace Temperature Controller, Model 560A Phase


Gas Distribution System

Basic Style: Integrated Gas System (STD)

Tubing : Stainless steel/ Electrical-polish (STD)

Tubing bends: Bend (Less than 90c)

Tube Heating (Include vacuum Line): Use

Manual valve: Fujikin

Air-Operation Valve: Fujikin

Filter: MYKROLIS(Ni)

Regulator: CKD

MFC (Gas panel): HORIBA STEC/DIGITAL

Press. Transducer: NAGANO


System, Factory Automation

Soft Backfill Injector: Installed(OP)

Manifold Heater: NO used

Liquid Source Vapor System: None

Liquid Source auto backfill: None (STD)

Auto-Refill Tubing interconnect by: N/A

Auto-Refill Provide By: N/A

Gas System Schem.Dwg / Parts List: 2192-352085-01*


Vacuum system

Vacuum exhaust system: 3inch pipe

Pump: 1800HTX

Pump Provided by: Edwards

N2 Gas panel for pump provide by: TEL

Pump FNC Vac provide by: Customer (STD)

Vacuum Pressure controller: CKD VEC

"Vacuum gauge-Pressure ctrl: MKS(HOT)Capacitance

Manometer"

"Vacuum gauge-Press Monitor-133kpa: MKS(HOT)Capacitance

Manometer"

Main Valve: CKD-VEC

Trap: Pipe trap


Wafer/Carrier Handling

Wafer Type: 300 SEMI STD-Notch

Wafer Notch Aligner: Installed (OP)

Carrier Type: FOUP / 25slots (SEMI STD)

Carrier Maker/ Type: Entegris/AF3CWAB20BUAFW

Carrier Storage Qty: 16

W/T Wafer I/F speed (U/D): Standard 

Fork Type/ Material: 1+4 Edge Grip/ A12O3 (STD)

Wafer Loading/ Unloading Sequence: ED -> P -> M / M ->P ->ED

Cap Heater: Use


Boat / Pedestal

Qty.of Production Wafers: 100pcs

Boat Material: SiC

Boat Type: 141Slots loader

Boat Rotation: Installed

Pedestal Type: Quartz


Process Tube

Outer/Inner Tube Material: Quartz+Quartz

Liner Tube: Straight

Process Tube: Outer tube interior wall type(For CVD)

Tube Sealing: O-ring seal 


System Controls

System Controller: WAVES

Front Operation Panel: Installed(OP)

Front MMI and Gas Flowchart: Installed

Signal Tower/ Close: Installed/4 colors

General Pressure Display Unit: Pressure-Mpa/Vac-Torr

Gas Cabinet Exhaust Display Unit: SI (Pa)

Furnace Temperature Controller: M560A Phase


Gas Leak Detection

Gas Detection Provided By: TEL

Gas Detection System Maker: Riken

Detected Gas 1/ Point: NH3-Gas box

Detected Gas 2/ Point: SiH2CL2-Gas box


Facility Elect. Equip. Pwr Input

Voltage 3 phase: 208VAC

Voltage 1 phase: 120VAC

Control Power UPS provided by: Customer

Ctrl Pwr UPS make/ model: Fab-wid system

UPS Input Voltage/ Output Voltage: N/A

Power Input Entrance Location: Power Box Top


Unit Location

Power Box: Downstairs

Rapid Cooling Unit: Not installed

UPS Input Voltage/ Output Voltage: Not installed

Pump Unit: Downstairs


Gas Layout Drawing Parts List

HAND VALVE: HV1~10

HAND VALVE: HV11-15

FILTER: F1,6,7

FILTER: F2~5,8,9

REGULATOR: RG1

REGULATOR: RG2,5,6

PRESSURE TRANSDUCER: PT1~7

DIGITAL PANEL METER: PT1~7

MASS FLOW CONTROLLER: MFC-NR

MASS FLOW CONTROLLER: MFC-NX,N1

MASS FLOW CONTROLLER: MFC-NY,N3

MASS FLOW CONTROLLER: MFC-N2

MASS FLOW CONTROLLER: MFC-M1

MASS FLOW CONTROLLER: MFC-M2

MASS FLOW CONTROLLER: MFC-D1

MASS FLOW CONTROLLER: MFC-J1

MASS FLOW METER: MFM-D1

AIR OPERATION VALVE: NX2,N12

AIR OPERATION VALVE: NY2,N22,32,NR2

AIR OPERATION VALVE: M11,21,D11,Z11,Z21,J11 WITH P.S

AIR OPERATION VALVE: M12-14,22-24,D12-14,Z12-14,Z22-24,J12-14

AIR OPERATION VALVE: M15,25,D15,Z15,Z25,J15WITH P.S

CHECK VALVE: CV1,9,13,17

CHECK VALVE: CV2

CHECK VALVE: CV21

CHECK VALVE: CV3,6

CHECK VALVE: CV10,14,18

CHECK VALVE: CV22

CHECK VALVE: CV5,8,12,16,20,24

CHECK VALVE: CV4,7

CHECK VALVE: CV11,15,19

CHECK VALVE: CV23

REGULATOR UNIT: RG7,BV1

REGULATOR UNIT: RG8,BV2

REGULATOR UNIT: RG9

PRESSURE SWITCH: P.SW1,2,14

FILTER: F10

AIR OPERATION VALVE: NR3

ORIFICE: OF1

AIR OPERATION VALVE: IV1 WITH P.S

AIR OPERATION VALVE: IV7 WITH P.S

AIR OPERATION VALVE: IV2 WITH P.S

AIR OPERATION VALVE: VV1 WITH P.S

AIR OPERATION VALVE: VV2 WITH P.S

CYCLDER VALVE: MV

NEEDLE VALVE: NV2

CHECK VALVE: CV25

CAPACITANCE MANOMETER: VG1

CAPACITANCE MANOMETER: VG2

CAPACITANCE MANOMETER: VG3

PRESSURE SWITCH: P.SW11

DRY PUMP UNIT: MBP/DP

BALL VALVE: B21

FILTER: F21-22

REGULATOR : RG21-22

PRESSURE GAUGE: PG21-22

FLOW CONTROL SYSTEM: NL,LA1,2

FLOW METER: FM NFS,NFA

AIR OPERATION VALVE: LA3,PB1

BALL VALVE: BV22

REGULATOR: RG23

PRESSURE SWITCH: P.SW21

FILTER: F423,24


Damage/Missing parts list

Please inspect tool to reconfirm

Dry pumps and customer provided items not included on sales


Enquire about this product

I agree to receive further communication from Macquarie Group Limited in accordance with its Privacy Policy, as amended from time to time.

Product Images

The information referenced on this page is accurate to the best of our knowledge. We do not warrant the completeness or accuracy of the information contained herein. Interested parties are encouraged to request inspection to verify equipment condition, configuration, and completeness. Any offer to purchase equipment shall be subject to our standard terms and conditions of sale.


Related products

No results message:
Displayed when filters returns no results.

We couldn't find any items that match your criteria.

Please try a different keyword.

Service unavailable:
Displayed when filter service cannot be reached.

Sorry, this service is currently unavailable.

Please try again later.

Get in touch

Have a question for our team?

Ask about our equipment solutions, ranging from Macquarie equipment inventory sales, sourcing programs, surplus disposition options, and direct equipment purchases.

I agree to receive further communication from Macquarie Group Limited in accordance with its Privacy Policy, as amended from time to time.