Macquarie
Why Invest in MPT?  
MPT site Middle Banner
QUICK FACTS
  ASSET OVERVIEW
Location:
Sechelt, British Columbia   The Sechelt facility is located on Sechelt Creek, which runs into Salmon Inlet. The facility captures the energy of water to generate electricity. With the use of two vertical Pelton turbine/generator sets, Sechelt converts the energy of moving water into electrical energy, which is then delivered through a 300-metre transmission line to BC Hydro's grid. In 2005, the Sechelt facility won the International Hydro Association's Blue Planet Award for environmental excellence.
Start of Operations:
1997
Ownership Interest:
100%
Size:
16 MW
Availability*:
96.3%
Power Purchase Agreement Expiry:
2017
Customer:
BC Hydro
*Weighted average availability of MPT's hydro facilities for the year ended December 31, 2008
KEY PERFORMANCE DRIVERS   HYDRO POWER FACT SHEET
Contracted long-term electricity rate provides stable revenue

As a zero-cost renewable energy source, water eliminates volatility related to fuel prices

Low maintenance and capital expenditure requirements support low variability of cash flow
Hydro Power Fact Sheet
(pdf 1MB)

 

 


  Important information | Privacy policy
Macquarie Group Limited