The Erie Shores Wind Farm consists of 66*** General Electric SLE1.5 wind turbines/generators. The electrical energy generated by the wind turbines is collected and delivered by 34.5kV collection lines, which ultimately deliver the power to the Port Burwell substation. At the substation, the voltage is increased to 115 kV for delivery to the Ontario transmission grid.

 

Start of Operations:
2006
Ownership Interest:
100%
Size:
99 MW
Availability*:
95.0%
Power Purchase Agreement Expiry:
2026
Customer:
Ontario Power Authority
Other Contracts:
General Electric Canada provides a four-year, fixed cost operation and maintenance program
*In the year ended December 31, 2008
**As of April 2, 2009
***One of the wind turbines is owned by a local landowner. Erie Shores maintains operational and managerial control of this wind turbine.
 
KEY PERFORMANCE DRIVERS   ERIE SHORES FACT SHEET
Contracted long-term electricity rate provides stable revenue
As a renewable energy source, wind eliminates volatility related to fuel prices

Low operating costs, due to low maintenance requirements and reliability of equipment, support low variability of cash flow

Availability of 97% guaranteed by General Electric for first four years of operations

Erie Shores Wind Farm Fact Sheet (pdf 2.2MB)
   

 

 